Godfather Concrete
 Call us: Ron Dago CEO/President 
Office:405-562-4808
Fax: 405-562-4811​
HomeAbout UsPhoto GalleryServices



Bid Sheet:  Please contact us for custom prices
Godfather Concrete
Ronald "Dago" D'Elia

1321 S Fretz #110
Edmond, OK  73083 
godfatherconcrete@yahoo.com 

General Contractor or Construction Manager:
Job Name & Location: 
All prices are negotiable and must be agreed by both parties. Turn key prices available.
Float Finish                                                                                                                        
1. Mop Finish                                                                                                                                                                            
2. Hand Float Finish                                                                                                                                                                  
3. Machine Float Finish                                                                                                                                                             
Trowel Finish (Floors & Tilt Up Walls)                                                                                 
1. Hand Trowel Finish (Behind Machine)                                                                                                                                      
2. Machine Trowel Finish                                                                                                                                                            
3. Hard Trowel Finish (Burnt In Floors)                                                                                                                                         
4. Fine Grade Sand, Place Wire Mesh, Pour & Finish                                                                                                                   
Curb, Gutter, & Paving                                                                                                      
1. Finish Curb Top Only                                                                                                                                                              
2. Straight Curb Without Gutter                                                                                                                                                   
3. Curb & Gutter                                                                                                                                                                       
4. Machine Float & Broom                                                                                                                                             
5. Paving - Machine Trowel & Broom                                                                                                                                           
6. Paving - Mop & Broom                                                                                                                                                           
Sidewalk                                                                                                                          
1. Regular Sidewalk With Normal Tool Joints                                                                                                                                
2. Sidewalk & Patios With Extra Joints - Add:                                                                                                                              
Exposed Aggregate                                                                                                         
1. Integral Mix                                                                                                                                                                           
2. Cast on Rock                                                                                                                                                                         
Steps                                                                                                                                
1. Concrete Steps Finish Tops Only (Strip and Finish Face)                                                                                                          
2. Pan Steps (Brush Finish Top and Trowel Finish)                                                                                                                       
Bleachers                                                                                                                       
1. Brush Finish Top                                                                                                                                                                    
2. Trowel Finish Top                                                                                                                                                                   
3. Rubber Float Face                                                                                                                                                                 
Custom - -
1. Stain Concrete                                                                                                                                                                      
2. Stamped Concrete                                                                                                                                                                 
3. Overlay                                                                                                                                                                                 
4. Restoration                                                                                                                                                                           



Turn- Key Price: sq. ft. (Labor Only)
We have Complete Turn-Key prices witch provide our labor costs only, the General Contractor Provides Material and all other Costs. Note: Please call for complete break down of costs entailed in the Turn-Key process.

Cost Plus Jobs:

Floors & Tilt up walls of 3,000 sq. ft. or less and sidewalks of 2,000 sq. ft. or less will be billed as a cost plus job. These jobs will be bid at the cost of the laborer ($170.00 per day) and/ or a finishers ($255.00 per day). All overtime hours in the winter months will be picked up by the General Contractor unless otherwise waved by Godfather Concrete. General Contractor Will be responsible for lifting trowel machines up on elevated floors. Note: These prices are only good good for the State of Oklahoma, please contact our firm for prices on work performed outside of the State of Oklahoma. Thank you For taking the time to review our bid sheet and please do not hesitate to call with any questions or comments. We look forward to work with your firm. Please call for turn-key prices.